Wheelchair Ramp Reconstruction

Work was completed in March/April 2023 in advancement of pavement schedule on the following streets:

  • Hudson Street
  • Prince Street
  • Dexter Street
  • Elm Street
  • Gulliver Street
  • Pilgrim Road

The following image shows pre- and post-construction examples side by side.

Pre and Post Construction Wheelchair Ramps